Marks & Spencer – Trowbridge Foodhall

Contract Value: <£500K
Work Completed: July 2017
Contract Period: 6 Weeks

The project required an extensive Mechanical and Electrical fitout of a new Foodhall store in the town of Trowbridge in Wiltshire.

Works involved the installation of;

  • New lighting & Emergency Lighting
  • Power
  • Fire Alarm System
  • HVAC Air Mixing ventilation system
  • Public Health

A bespoke modular boiler plant was designed and fabricated by us in our workshop, enabling its swift installation into the tight space available on site.

Analysing the building plans enabled us to prefabricate the store’s services trays to speed up fitting and our electrical engineers also designed, built and installed the store’s LV distribution panel to fit the client’s requirements.